Hi,
I'm new in QM.
I'm testing different quality planning methods and now I'm trying to do a process with material specification.
The issue is that when I do the GR for a raw material, the system creates an inspection lot as expected. But the problem is that I cannot record the results (QE51N) neither de UD. The system error informs of an status problem.
When I display the inspection lot I noticed that has the CRTD status (created) instead REL status(Released).
Best Regards,
OCS.